Verification Round Plan for PC-2016-04

Verification Round PC-2016-04 is now underway, with a total of 77 investigations planned (a mix of Level 0 and Level 1). All Level 0 investigations have been completed and Level 1 investigations were launched on October 4, 2016. The Verification Plan for PC-2016-04 can be found here.

A total of 68 Level 1 investigations will be performed to verify criteria 4.5.1.1 and 4.5.1.2 on monitors and signage displays, and for 4.3.2.2 for each manufacturer claiming it. Additionally, one manufacturer will be subject to a targeted investigation for 4.8.2.1.  In Level 1 investigations, an Auditor assesses Conformance to a criterion by examining information submitted by an EPEAT Participating Manufacturer. The Manufacturer is required to provide detailed and accurate information in a 60-day period.

You can download the Verification Round Plan here.