Personal Computers and Displays Verification Round Plan PC-2013-05 – launch in mid-November 2013

The Verification Round Plan for PCs and Displays (Round PC-2013-05) is now available. This Round will focus on Level 2 investigations. Products will be purchased without the knowledge or participation of the manufacturer, and disassembled and inspected to verify conformance with three required criteria (4.3.1.3, 4.3.1.5, and 4.8.2.1) and five optional criteria (4.3.1.6, 4.3.1.7, 4.3.2.1, 4.3.2.2, and 4.8.2.2). Forty-six investigations are planned, and the Round is expected to begin sometime in mid-November 2013.

Round PC-2013-05 Verification Plan